date-created: '2018-04-29'
date-updated: '2026-01-08'
manifest-author:
    name: Appropedia
    email: admin@appropedia.org
title: 'Zane Middle School/Permeable concrete 3'
description: 'The purpose of the project was to replace a failing permeable pathway (Fig 1) at Catherine Zane Middle School in Eureka, CA with a functioning permeable pathway. The previously installed pathway was uneven, impermeable and produced undesirable loose gravel. The new path was successfully implemented and the middle school now has a solid, level, and permeable concrete pathway in the Peace Garden.'
keywords: 'permeable concrete pathway, sustainable design, drainage, Gravel, Cement'
project-link: 'https://www.appropedia.org/Zane_Middle_School/Permeable_concrete_3'
contact:
    name: U
    social:
        platform: Appropedia
        user-handle: U
version: 130
development-stage: D
made: false
image: 'https://www.appropedia.org/w/images/c/cc/Permeableconcrete_zanemiddle.jpg'
variant-of:
    title: C
    web: 'https://www.appropedia.org/C'
license:
    documentation: C
licensor:
    name: U
    affliation: C
    contact: 'https://www.appropedia.org/U'
documentation-home: 'https://www.appropedia.org/Zane_Middle_School/Permeable_concrete_3'
documentation-language: e
